Workshop - Kędzierzyn Koźle
•Hall 3400m2
•Access to parking tracks
•Operation of the operator's locomotive, together with staff (driver, setter) -shunting within the station, possible transport of damaged wagons to the workshop within a radius of a few dozen kilometres from Kędzierzyn Koźle,
•Planned inspection of level P1/P2 of locomotive/wagon
•Planned maintenance of P3, P4 and P5 levels of wagons
•Planned overhauls of wagons - exchange of bogies or wheel sets, reprofiling of sets on the track lathe, welding and mechanical works, diagnostics and repair of the combined brake; (selected works in cooperation)
•Planned running repairs on locomotives
•Providing an external inspection pit on the siding site
•Providing an inspection pit inside the hall
•Three tracks inside the hall, each 60m long, two with a canal - can handle even the longest locomotives
•Mobile maintenance of wagons / locomotives